Generatiounencampus Wobrécken – Pilot project for circular construction

Witry & Witry architecture urbanisme

Generatiounencampus Wobrécken – Pilot project for circular construction

Description

The campus for 400 children houses a kindergarten, a primary school, a daycare, as well as a sports hall and a crèche. Thanks to the compact design, the project concentrates on a small part of the site, allowing half of the available land to be developed as a publicly accessible park. During the realisation of this “pilot project for circular construction”, a holistic methodology was used to take into account the entire life cycle of the building realized as wooden construction in accordance with the principles of the circular economy. Thanks to this holistic approach, the construction is carbon-negative and the building materials can be separated without damage and reused in the end.

Video

https://www.youtube.com/watch?v=CZt1bOVjOeg

Catégorie

Bâtir la durabilité

Edition du LAA

2026

AUTEUR(S)

Witry & Witry architecture urbanisme

AVEC

Aucun

Maître d'ouvrage

Ville d'Esch-sur-Alzette

Superficie

11.270 m²

Année de fin

2023

Localisation (ville)

Esch-sur-Alzette